When floodwater enters your home, the clock starts immediately. Mould spore germination can begin within 24-48 hours of saturation in warm conditions. The Northern Rivers’ subtropical climate, warm, humid air, temperatures rarely below 20°C, means that post-flood mould can establish extremely quickly.
The 72-hour window is the critical window in professional water damage and mould response. Work done within 72 hours of the water receding can, in many cases, prevent mould from establishing. Work that starts after 72 hours is responding to an established mould problem rather than preventing one.
This guide gives you the hour-by-hour protocol for the first 72 hours, and the week-by-week protocol for the 7-day recovery period.
Before the Water Recedes: Pre-Return Safety
Do not return to a flooded property until:
- Emergency services have confirmed it is safe to enter
- Floodwater has receded from inside the structure
- Electrical power to the property has been confirmed safe by an electrician or Essential Energy
Entering a property with floodwater still present, or with electricity on, is life-threatening. This guide assumes the water has receded and the property has been confirmed safe to enter.
Hours 0-6: First Entry and Initial Assessment
Safety first:
- Wear rubber boots, disposable gloves, eye protection, and an N95 or P2 respirator, floodwater contains biological and chemical contaminants
- Do not use electrical equipment until confirmed safe
- Watch for structural instability (bowed walls, sagging ceilings, cracked footings)
Document everything:
- Take photos and video of all areas before touching anything
- Note the waterline on walls, this tells you the maximum height of inundation
- Note all damaged items (contents, fittings, structure)
Initial actions:
- Open all windows and doors where safe to do so
- Remove standing water with mops, buckets, or a petrol-powered pump (before electricity is restored)
- Begin removing wet soft contents: carpets, rugs, fabric furniture, clothing, bedding
Hours 6-24: Aggressive Drying Begins
This is the most critical phase. Your goal: remove as much moisture from the building as possible before the first 24 hours is up.
Remove wet materials that cannot be dried in place:
- Carpets and carpet underlay: these cannot be adequately dried in place in Northern Rivers conditions, remove and dispose
- Wet gypsum plasterboard: plasterboard that has been submerged will not dry effectively in place; it should be removed in sections (cut at least 500 mm above the waterline for flood-inundated walls)
- Wet insulation batts: fibreglass and polyester insulation cannot be effectively dried in place; remove and dispose
- Wet particleboard (floating floor substrates, kitchen kickboards, furniture panels): remove and dispose, particleboard loses structural integrity when wet
Set up drying equipment:
- Position fans to maximise airflow across wet surfaces, including in the subfloor if accessible
- Set up dehumidifiers in enclosed spaces and rooms where windows can’t be opened
- If power is not restored, prioritise generator power for drying equipment
Notify your insurer (if not already done):
- Call your insurer immediately, delayed notification can complicate claims
- Most policies require prompt notification of flood damage
Hours 24-48: Structural Drying and Subfloor Priority
Subfloor is the highest priority after hours 24-48:
- Floodwater that entered the subfloor carries silt, debris, and organic material that creates an ideal mould substrate
- Check the subfloor at this point, if it still has standing water or the soil surface is saturated, continue pumping
- Where accessible, set up fans in the subfloor space
- Begin clearing silt and debris from the subfloor while wearing full PPE
Wall cavity assessment:
- For walls that were inundated up to 500 mm height: the insulation and cavity are likely significantly wet; cavity drying may be possible if you cut inspection holes at the base and top of the affected section to allow airflow
- For walls inundated above 500 mm: professional assessment is recommended; full strip-out of wall lining in affected sections is often the most time-efficient approach
Check for mould beginning:
- At 48 hours post-inundation, surface mould may already be visible on paper-faced gypsum, on timber surfaces in poorly ventilated spaces, and on stored contents
- Any visible mould at this stage should be documented (photos) and professional help engaged if you cannot safely manage it yourself
Hours 48-72: The Critical Decision Point
At 72 hours, you need to assess whether the property is on track for successful drying or whether professional water damage remediation is required.
Professional help is required if:
- Visible mould is already present on structural surfaces
- Wall cavity moisture readings (if you can access) are above 20%
- Subfloor timbers are still wet (above 18% moisture content)
- You are unable to get adequate drying equipment running
- The building had more than 500 mm inundation depth
- There is damage to more than 20% of the floor area
- You are unclear about the extent of contamination
If self-managing is still viable:
- Confirm fans and dehumidifiers are running continuously
- Moisture meter readings on plasterboard should be falling, if not, additional material removal is needed
- Apply diluted antimicrobial solution to exposed timber and masonry surfaces (subfloor, wall framing where visible) to inhibit mould establishment in the drying period
Day 3-7: Extended Drying and Prevention
Day 3-4
- Continue drying equipment running 24 hours a day
- Check moisture readings on wall surfaces twice daily, numbers should be falling toward target (below 15% for timber, below 1% for concrete/masonry)
- Treat any surface mould that appears on exposed surfaces with antimicrobial spray
- Continue subfloor cleaning and drying
Day 5-6
- If drying is progressing well, begin selective material decisions: which framing timbers are dry enough to re-line over, which need further time
- Do not begin re-lining or installing new materials until moisture readings are confirmed below target
- If engaging a building restoration company, this is typically when they will do formal moisture surveys to confirm drying progress
Day 7
- A professional moisture survey at Day 7 provides a clear picture of what is dry and what isn’t
- Any areas still above moisture targets need more time or more aggressive drying before reinstatement
- If mould is visible anywhere, treat before proceeding with reinstatement
Post-7 Days: Reinstatement and Prevention
Once moisture readings have been confirmed below target:
- Re-line exposed wall framing with new plasterboard
- Install new insulation (do not reinstall wet insulation)
- Reinstall flooring once subfloor is confirmed dry
- Apply mould-resistant primer and paint to new surfaces
- Improve ventilation if subfloor or wall cavity ventilation was inadequate
Post-remediation air testing should be completed before the building is reoccupied by vulnerable household members, and is recommended before occupation by anyone. This provides documented assurance that spore counts have returned to acceptable levels.
Lismore and Northern Rivers Flood-Specific Notes
The 2022 Lismore floods demonstrated that standard drying protocols are sometimes insufficient after catastrophic inundation events:
- Properties inundated for more than 48 hours require more aggressive intervention, materials that might be salvageable after a few hours of inundation may not be after 48+ hours
- Silt and debris from the Richmond River carries a significant biological load, professional cleaning and antimicrobial treatment of the subfloor and lower walls is not optional after a major river flood
- Community recovery pressure can push property owners to re-enter and reinstate too quickly, the 2022 flood recovery saw many homes re-lined before the framing was adequately dry, creating ongoing mould problems that are still being addressed years later
Quick Reference: Flood Mould Response Timeline
| Timeframe | Priority Actions |
|---|---|
| Hours 0-6 | Safety check; photograph; remove standing water; remove wet soft contents |
| Hours 6-24 | Set up drying equipment; remove unsalvageable materials (carpet, wet plasterboard below flood line) |
| Hours 24-48 | Subfloor priority; wall cavity assessment; first antimicrobial treatment of exposed surfaces |
| Hours 48-72 | Decision point, self-manage or engage professional; continue drying |
| Day 3-4 | Continue drying; treat emerging surface mould; moisture monitoring |
| Day 5-7 | Formal moisture survey; plan reinstatement |
| Post-Day 7 | Reinstatement when dry; post-remediation testing |
Frequently Asked Questions
The flood water only came in for a few hours and it’s gone now. Do I still need to worry about mould? Yes. Even a few hours of inundation saturates building materials enough to create mould risk in Northern Rivers temperatures. Remove wet materials, set up drying, and monitor moisture readings. The shorter the inundation, the better your odds, but don’t assume that a brief flood means no mould risk.
Can I stay in the house while it’s drying after flooding? Short-term presence to manage the recovery is fine with appropriate PPE. Extended habitation in a property that had significant flooding is not recommended until moisture readings are at target and the property has been cleaned and treated. Children, elderly people, pregnant women, and immunocompromised individuals should not re-enter until a professional clearance.
My insurance company says it will take 2 weeks to send an assessor. Can I start removing damaged materials? Yes, you have a duty to mitigate further damage, which includes beginning the drying process. Document thoroughly with photos and video before and during any removal. Keep all removed materials in one place until the assessor has seen them if possible, or photograph them clearly before disposal.
What antimicrobial products should I use on exposed framing timbers after flooding? EPA-registered antimicrobial products containing quaternary ammonium compounds (quats), hydrogen peroxide, or sodium hypochlorite are commonly used for post-flood timber treatment. Follow product instructions for dilution and contact time. Professional remediators use commercial-grade products at concentrations not available in consumer products.