Mould under a bamboo floor almost always means moisture is reaching the underside of the boards: from a damp concrete slab, a poorly ventilated timber subfloor, a leak or a flood. Bamboo takes up and gives off moisture and moves as humidity changes, which is why suppliers require a moisture barrier under it. The only reliable way to see the problem is to lift boards, and the only lasting fix starts with the moisture source, not the mould.
Why moisture gets under bamboo
One Australian supplier’s installation instructions (a manufacturer document, not a standard) say bamboo is hygroscopic and expands and contracts with changes in humidity, and that every installation needs a moisture barrier between the subfloor and the boards (Eco Flooring Australia: BT Bamboo installation instructions, August 2014). The same document describes the main ways water gets in:
- Concrete slabs. Every slab installation, including suspended slabs, needs a moisture barrier, and a slab reading above 5.5% moisture content on a commercial meter is too wet to lay on, citing AS 1884-2012 (Eco Flooring Australia). It says slabs younger than 60 days are generally too wet, and that the membrane under the slab, soil piled against it and drainage around it should all be checked.
- Timber subfloors. Water vapour from the soil can saturate a subfloor without enough cross ventilation and rise into the flooring, so the instructions call for vents in all external walls and clearance under the floor (Eco Flooring Australia). NSW Health likewise says poor subfloor ventilation worsens damp and that weep holes and air vents at the base of a home should be kept clear (NSW Health: Mould).
- Leaks, spills and wet areas. The board coating is water resistant but not waterproof, and the product is not meant for bathrooms or laundries (Eco Flooring Australia). A leaking dishwasher, a shower that leaks through a wall or a regularly wet doorway can feed mould under the boards nearby.
- Condensation. Your Home notes that condensation can form inside floors as well as on visible surfaces, and can lead to mould (Your Home: Condensation).
- Floods. Water under a floating floor has nowhere to go. NSW Health advises drying a house as soon as floodwater recedes and checking floor cavities for trapped water and mud (NSW Health: Household clean-up after a flood or storm).
Signs worth checking
A musty smell near the floor that cleaning the surface does not shift; boards that cup, lift, gap or feel soft in one area; dark staining creeping in from board edges. None of these proves mould, and NSW Health notes that symptoms alone are not a reliable indicator of it. The musty smell guide covers other sources of the same smell.
Finding it
NSW Health says testing is generally unnecessary because most mould is visible once surfaces are inspected, although some can be hidden in cavities (NSW Health: Mould). Under a floor, “inspected” means lifting a board or two where the smell or damage is worst; a floating floor usually unclicks, while a glued floor is often damaged coming up. Moisture meter readings and thermal imaging can help decide where to lift. If the subfloor is accessible from below, look there too: the crawl spaces and elevated floors guide covers raised homes, and the slab homes guide covers slabs. A mould inspection puts it in writing.
What remediation involves
- Stop the moisture. Improve subfloor ventilation, deal with drainage against the slab, repair the leak. For rising or lateral damp, NSW Health suggests an experienced building consultant.
- Lift the affected flooring and set aside boards that are clean and sound.
- Decide what is salvageable. Boards stained through, delaminating or swollen are usually discarded. SafeWork NSW’s workplace guidance is to discard porous materials that have been wet for more than 48 hours (SafeWork NSW: Mould at work); particleboard subfloors that have swollen are commonly replaced.
- Clean and dry the subfloor completely. NSW Health’s cleaning advice is detergent or diluted vinegar, then drying fully. Do not re-lay over a surface that is still damp.
- Rebuild properly. Replacing a timber subfloor is building work: in NSW a contractor licence is needed for residential building or trade work valued at more than $5,000 in labour and materials, including GST (NSW Government: General building work).
- Re-lay to the instructions. The supplier document above calls for a moisture barrier with taped joints, an underlay, an expansion gap at every wall and fixed object, and boards left in the room to acclimatise before laying. Follow the instructions for the product actually used; they differ between suppliers.
The mould remediation page explains containment and what a scope should include.
Re-lay bamboo or choose something else?
Any floor laid back over a damp slab or an unventilated subfloor will have the same trouble, so the choice of material matters less than fixing the moisture. If the area is regularly wet, such as near a laundry or an external door, ask the installer which products the manufacturer permits there.
Frequently asked questions
The floor smells musty but looks fine. Is it mould underneath?
It may be. The only way to know is to lift a board where the smell is strongest and look at the back of the boards and the subfloor.
Can mould under bamboo be treated without lifting the floor?
Spraying or fogging through the gaps does not remove growth on the back of the boards or fix the moisture. Lifting is the usual approach.
The floor is new and already mouldy. Is that a product fault?
Check the installation instructions for that product, including the moisture barrier, slab moisture limit and acclimatisation steps, and ask the installer what was done. Under the Australian Consumer Law, services must be carried out with acceptable care and skill (ACCC: Consumer rights and guarantees).
What does it cost to lift and re-lay?
It depends on the area, whether boards can be reused, the subfloor repair and the drying time. National mould removal ranges are in the cost guide; flooring supply and laying are quoted separately.
Request a quote with photos of the floor and where the smell or damage is worst.
Sources
- Eco Flooring Australia: BT Bamboo installation instructions: manufacturer document (August 2014, hosted by a retailer) on moisture barriers, slab moisture, subfloor ventilation and expansion gaps. Checked 15/11/2026.
- NSW Health: Mould: subfloor damp, testing, cleaning. Checked 15/11/2026.
- NSW Health: Household clean-up after a flood or storm: drying after a flood. Checked 15/11/2026.
- SafeWork NSW: Mould at work: porous materials wet for more than 48 hours. Checked 15/11/2026.
- Your Home: Condensation: condensation inside floors. Checked 15/11/2026.
- NSW Government: General building work: the $5,000 licence threshold. Checked 15/11/2026.
- ACCC: Consumer rights and guarantees: consumer guarantees for services. Checked 15/11/2026.